EnergyWorksCompliance
Los Angeles EBEWE · LAMC Division 97

Your building's energy filings, handled every year.

Los Angeles requires buildings of 20,000 sq ft and up to benchmark energy and water every year and complete an audit or retro-commissioning every five. We gather the utility data, file with the city, track every deadline, and coordinate the five-year audit with a licensed engineer.

June 1Annual benchmark due, for the prior year's usage
Dec 1Five-year audit due, set by your Building ID
46%of covered buildings missed the June 2026 filing
Deadline check
12 digits, from Box 2 of the city's Notice to Comply. Prefilled with an example building.
Official status for any building: LADBS compliance lookup
What the city requires

Three obligations, and a fee for missing any of them

LAMC 91.9705

Benchmark every year

Report the prior calendar year's energy and water use through ENERGY STAR Portfolio Manager, register the building and pay the city fee by June 1. A report filed without the fee still shows as not complied.

LAMC 91.9706

Audit or retro-commission every 5 years

An ASHRAE Level II audit or a retro-commissioning study, supervised and signed by a California-licensed engineer or architect, due Dec 1 of your building's year. Owners don't have to carry out the findings.

LAMC 91.9709

Miss it and it's public

A $202 non-compliance fee, 250% more if unpaid after 30 days, and a status anyone can look up. Paying the fee doesn't make the building compliant.

Plans

One flat fee per building, every deadline included

City filing fees are passed through at cost.

PlanWhat's includedPrice
Annual ComplianceUtility-data requests to LADWP and SoCalGas, Portfolio Manager setup, city registration and filing by June 1, a one-page results summary, and tracking of your audit year$395 / building / yr
PortfolioAnnual Compliance for owners and managers with five or more buildings$295 / building / yr
Catch-upFor a building that missed a filing: back-file the missing year, clear the city notice, then continue on Annual$595 first year
Status FixReport filed but the building still shows not complied, usually an unpaid registration. We register, pay and confirm the status changes$195
Audit YearOur engineering partner performs the audit or retro-commissioning and signs the declaration; we collect the data, schedule, register and filePartner quote + $1,500

Audits and retro-commissioning are performed under the supervision of, and signed by, a California-licensed engineering partner.

How it works

About ten minutes of your time a year

  1. Sign and authorize

    A short agreement and the utility forms that let us request whole-building data for you.

  2. We gather the data

    LADWP electric and water and SoCalGas gas flow into Portfolio Manager. LADWP takes four to six weeks, so we request it by March 1.

  3. You see the results

    A one-page summary of your ENERGY STAR score and energy use, and whether you qualify for an audit exemption.

  4. We file and confirm

    Registration, fee and submission by June 1, then a check that the city shows the building as complied.

Questions

Common questions

Does my building need to comply?

Privately owned buildings of 20,000 sq ft or more, and City-owned buildings of 7,500 sq ft or more, are covered. One- and two-family homes are excluded. The deadline check above tells you, and the LADBS lookup shows your building's official status.

How do I find my Building ID?

It's the 12-digit number in Box 2 of the Notice to Comply the city mails each December. Send us the address and we'll find it.

Can my building skip the five-year audit?

Possibly. ENERGY STAR certification in the due year or two of the three prior years, or a 15% drop in weather-normalized source energy use over five years, are among the exemptions. We check this for every client before booking an audit.

Do I also have to file with the State?

Los Angeles is an exempted local program, and from 2026 the State no longer accepts separate reports from buildings covered by EBEWE. The California Energy Commission still mails notices to some large buildings, so send us any you receive and we'll confirm.

We already got a non-compliance notice. Is it too late?

No. Catch-up files the missing year and gets the building back to complied. The fee doesn't go away by paying it alone, so filing is still required.

Contact

Send us a building address

Include the address or Building ID, and we'll reply with its status, its deadlines and a price.

danny@energyworks.works

EnergyWorks · 21213 Hawthorne Blvd, Ste B #1046, Torrance, CA 90503